Central warehouse storage (heavy/medium duty)
Warehouses are about loads and flow. We design and execute heavy/medium duty storage based on product loads, aisle width, and handling processes.
Ideal for
- • Central warehouses
- • Distributors
- • Spare parts storage
- • High-bay utilization
Capacity: In‑house factory + installation teams • Up to 6 branches in parallel • 4–7 working days per branch • 1000m²+ formats
FAQ
How do you choose the system?
Based on load, height, and handling flow.
Do you handle large warehouses?
Yes.
Safety considerations?
Stability and realistic load capacity per spec.
Timeline?
Scope-dependent; medium scopes often align with 4–7 days, larger warehouses take longer.