Ops-ready handover: what must be done
Opening-ready means stability, safety checks, flow verification, and merchandising zones—not just installing shelves.
Practical takeaways
- • Define one standard spec before execution starts.
- • Deliver in waves instead of waiting for all branches.
- • Use one accountable partner for fabrication + installation.
- • Write a clear BoQ: counts, lengths, heights, loads, ends.
- • Run an acceptance checklist before opening.
Need a multi‑branch rollout?
Share branch count, locations, and approximate area per branch. We’ll send a corporate proposal and rollout plan.
Contact